Proven Design. Hidden Costs?

In today's competitive manufacturing environment, organizations are under constant pressure to reduce product costs while maintaining quality, reliability, performance, and customer satisfaction. Engineering departments play a critical role in achieving these objectives, but their contributions to cost reduction are sometimes limited by an understandable tendency to prioritize proven designs over alternative solutions. When a design has successfully passed validation, demonstrated reliability, and satisfied customer requirements, there is often little incentive to revisit it. After all, why change something that already works? 

However, this mindset can create significant opportunities for unnecessary costs to remain embedded in products for years, sometimes across multiple generations of development. 

Cost Engineering offers an opportunity to challenge this traditional approach. Rather than simply accepting established engineering practices as the most appropriate solutions, Cost Engineering introduces a disciplined examination of whether those practices continue to represent the most economically efficient way to achieve the required function. It encourages organizations to distinguish between what is necessary to satisfy engineering requirements and what has simply become customary through historical design decisions. 

The objective is not to undermine Engineering or compromise established standards.  Instead, it is to encourage a collaborative approach in which Engineering expertise and cost analysis work together to identify opportunities that may otherwise remain undiscovered. 

The most significant cost savings are not always achieved by negotiating lower supplier prices or identifying cheaper materials. Sometimes, they come from questioning the engineering decisions that created the original cost structure. 

The Comfort of Previously Validated Designs

Engineering organizations naturally place considerable value on repeatability, reliability, and risk management. When a component or assembly has completed validation, it establishes confidence that the design can meet its intended requirements.  Reusing that design on subsequent programs can reduce development time, minimize validation risk, and accelerate product launches.  These are legitimate advantages. 

However, the decision to reuse a validated design should not automatically translate into accepting every element of its original architecture, manufacturing process, material selection, or construction method. 

A previously validated design demonstrates that a particular solution works. It does not necessarily demonstrate that it is the most cost-effective solution available. 

Consider a component originally developed for a demanding application. During development, Engineering may have selected a particular material grade, manufacturing process, dimensional tolerance, or construction method to ensure sufficient performance under the anticipated operating conditions. The design passes validation and subsequently becomes the established solution. 

Several years later, that same component may be incorporated into another application with different operating conditions, manufacturing volumes, or customer requirements.  Rather than reassessing the original design, the organization may simply carry it forward. 

The result is that historical engineering decisions become embedded in new products, even when the original justification may no longer apply.  This phenomenon is particularly relevant in automotive manufacturing, aerospace, electronics, and industrial equipment, where product architectures frequently evolve through incremental changes rather than complete redesigns.  Over time, organizations can accumulate layers of engineering complexity that are technically acceptable but economically unnecessary. 

 The Difference Between Engineering Requirements and Engineering Habits

One of the most important contributions Cost Engineering can make is helping organizations distinguish between mandatory requirements and established engineering preferences. 

A requirement defines what a product must accomplish. A design decision defines how the organization has chosen to accomplish it. 

These are fundamentally different considerations. For example, a requirement may specify that an electronic enclosure must withstand a particular environmental exposure. Engineering may have historically achieved this through a particular sealing method, material specification, and manufacturing process. 

However, could another material provide equivalent environmental protection at a lower cost? Could a different manufacturing process eliminate secondary operations? Could the design geometry be modified to reduce material consumption without compromising structural integrity? 

These questions should not be interpreted as challenges to Engineering competence. They are opportunities to apply engineering expertise differently. 

NASA's Systems Engineering Handbook reinforces this principle by recognizing that multiple designs can satisfy technical objectives while producing different combinations of performance, cost, schedule, and risk. It specifically identifies design trade studies as a method of evaluating these alternatives and determining the most cost-effective solution.  

The implication for manufacturing organizations is significant: engineering validation should establish an acceptable solution, not permanently close the door to alternative solutions. 

 Cost Engineering as a Catalyst for Engineering Innovation

The effectiveness of Cost Engineering depends heavily on its ability to engage Engineering early and constructively. 

Traditional cost-reduction initiatives frequently begin after a design has been established, validated, and released for production. At this stage, changing the design can introduce significant complications, including additional validation requirements, supplier changes, tooling modifications, and potential production disruptions. 

Consequently, cost-reduction discussions often become focused on purchasing negotiations, supplier concessions, or incremental manufacturing improvements. 

While these activities have value, they do not necessarily address the underlying reasons a component is expensive. 

 Cost Engineering Introduces a Different Starting Point

Rather than asking how an existing component can be purchased or manufactured for less, the discussion begins with understanding what the component must accomplish and whether its current design represents the most economical way to achieve that objective. 

For example, an Engineering team may have developed a machined aluminium component because it provided excellent dimensional accuracy and structural performance. A Cost Engineer might challenge whether all those characteristics are necessary for the intended application.  Could a casting achieve the required performance? Could a stamped component replace a machined assembly? Could multiple individual components be consolidated into a single part? Could a lower-cost material satisfy the functional requirements?  These questions create opportunities for Engineering to reconsider the solution rather than simply optimize the existing one. 

Importantly, this process should be supported by manufacturing feasibility assessments, supplier expertise, functional analysis, and appropriate validation. 

The objective is not to pursue the cheapest theoretical design. It is to identify the lowest total-cost solution that satisfies the requirements throughout the product's life cycle. 

The Financial Impact of Challenging Established Designs

The financial value of challenging established engineering practices can extend well beyond the direct piece-price reduction associated with a redesigned component. 

Consider the cumulative cost structure of a relatively simple automotive assembly containing several individual components. If Cost Engineering identifies an opportunity to eliminate two unnecessary brackets, consolidate fastening features, and replace a specialized manufacturing process with a more efficient alternative, the resulting savings could include: 

  • Reduced raw material consumption. 
  • Fewer individual purchased components. 
  • Lower supplier manufacturing labor. 
  • Reduced tooling and processing requirements. 
  • Fewer assembly operations. 
  • Reduced inventory and material handling. 
  • Lower transportation and packaging costs. 
  • Improved manufacturing throughput. 

These benefits can compound across an entire product lifecycle. For high-volume applications, even a modest reduction in component cost can generate meaningful financial returns. 

McKinsey documented an example involving an aerospace manufacturer that established a dedicated Cost Engineering function to work with Engineering, Purchasing, and Supply Chain. The organization faced longstanding challenges associated with extensive testing and validation requirements for redesigned flight components. 

By integrating cost analysis, supplier collaboration, and improved design-for- manufacturing approaches, the company overcame these barriers and achieved average cost savings exceeding 10 percent. The resulting cost information was also incorporated into future product development activities.  

This example reinforces another important consideration: Cost Engineering should not operate independently of Engineering. Its greatest value comes from becoming an integrated part of the product development process. 

Overcoming the Resistance to Change

Despite the opportunities, challenging previously validated designs can encounter resistance within Engineering organizations.  This resistance is understandable. Engineers are accountable for product performance, reliability, safety, and customer satisfaction. A design modification introduces uncertainty, and the potential financial benefit must be weighed against the possibility of additional testing, validation expenses, or production complications. 

However, the absence of change also carries a cost.  When organizations repeatedly reuse existing designs without reconsidering their economic justification, they risk allowing unnecessary costs to become permanently established within their product portfolio.  

The solution is not to challenge every engineering decision indiscriminately. Instead, organizations should establish a structured process for identifying designs that warrant further evaluation. 

Cost Engineering can facilitate this process by providing objective cost breakdowns, manufacturing assessments, supplier benchmarking, and financial comparisons between alternative design concepts. Engineering can then evaluate the technical feasibility of those alternatives while Cost Engineering quantifies the potential financial benefits. 

This collaborative approach also helps shift the conversation away from personal preferences or departmental ownership of designs and toward measurable business outcomes. 

NASA's guidance on product reuse makes a similar distinction, recognizing that reuse can create savings, but that previously validated products must still be assessed against the  requirements and operating environments of their intended applications.  In other words, reuse should be an informed engineering decision rather than an automatic continuation of historical practices. 

The Best Engineering Solution Is Not Always the Most Economical One 

Cost Engineering has an important role in challenging the traditional boundaries between engineering excellence and manufacturing economics. 

A design that has successfully passed validation represents an accomplishment. However, its successful performance should not prevent an organization from exploring whether the same functionality can be achieved through a more economical approach. 

The historical valve standardization example demonstrates how reevaluating established practices can generate substantial material savings without abandoning the underlying functional objectives. Similarly, modern aerospace cost-reduction initiatives demonstrate the financial potential of integrating Cost Engineering into design decisions rather than limiting its involvement to purchasing negotiations or post-design cost reduction. 

 Ultimately, organizations should recognize that engineering best practices are tools for achieving objectives, not necessarily permanent restrictions on how those objectives must be accomplished. 

The most effective Cost Engineering organizations are those that encourage Engineering to periodically step back from the familiarity of existing designs and reconsider the original assumptions behind them. 

Why does this component have this many features? Is this material specification still necessary? Are we maintaining a level of performance beyond what the application requires? Are we repeating a manufacturing process simply because it was used successfully on a previous program?  These questions can uncover opportunities that conventional cost-reduction activities may never identify.  The objective is not to replace proven engineering solutions with untested alternatives. It is to recognize that engineering knowledge, manufacturing capabilities, supplier technologies, and product requirements continually evolve.  A design that represented the optimal solution ten years ago may no longer represent the optimal solution today. 

Cost Engineering creates value by making organizations question that distinction. 

When Engineering and Cost Engineering work together to challenge established practices, the result can be more than a lower-cost component. It can be a fundamentally more efficient product architecture, a simpler manufacturing process, and a stronger competitive position. 

The greatest cost-saving opportunity may not be found in changing how an existing design is manufactured. Rather, it may be found in challenging why the organization continues to manufacture it that way in the first place. 

 

James Schmidt has 22 years of Purchasing and Cost Engineering leadership experience across the automotive, manufacturing and retail industries. The past 12 years have been spent at General Motors with a primary focus on cost optimization in the Software-Defined Vehicle, ASAS and Electrical Modules spaces. James has been active within the Cost Engineering profession since 2019.   