Integrated Cost Engineering: How PLM-EPC integration makes product costs controllable
Category: Articles
Feb
28
From design to calculation – why networked systems make all the difference to profitability
In product development, up to 80 percent of the subsequent costs are already determined in the design phase. Nevertheless, cost evaluation often takes place shortly before series production begins – too late to take countermeasures. The consequences are costly adjustments, additional costs, and decisions based on uncertain data.

